Groundwork and structures
Check the drainage first. Dig a hole about 30 inches deep at the lowest point after a wet spell, fill it with water, and time how long it takes to empty. More than a day means the yard needs a drainage line or a gravel-filled sump before planting. While the ground is open, test the soil: Tennessee clay often runs acid and heavy, and a dressing of lime and some imported loam now saves trouble later. Bury the electrical for lighting and the water feature pump, and lay the irrigation lines, while the ground is bare, since both are far harder to add once the beds are planted. Then the hardscape: dining terrace paving on a compacted base, the grill pad, the pergola, the wall trellis, the arch, and the cupboard shed. Build the fire pit in the second lobe and set the bamboo water feature.